BRIEF DESCRIPTION

1920 Craftsman home had multiple different types of flooring over the years.  Existing flooring had different heights and was not level.  Old flooring was removed and all of the rooms adjusted to the same level using plywood and self leveling compound as an underlayment.  Installation of laminate flooring through out.

AT A GLANCE

Project Type New Flooring
Client Private Homeowner
Completion Date Janurary 2019
Project Size 2100 Square Feet
Contract Value $10,220

SCOPE OF WORK

Pergo Outlast+ Somerton Auburn Hickory is a beautiful array of warm, brown colors with golden undertones.

  • Financial Responsibility to Our Clients
  • Superior Quality and Craftsmanship
  • Quality and Value to the Projects We Deliver
  • Highest Standards in Cost Control

Existing floor underlayment must be brought leve to within 1/8th” tolorence to achieve a long lasting durable finish project.

  • Remove Old Base Trim
  • Strip Existing Flooring and Level
  • Install Padded underlayment-Install Laminate
  • Reinstall Base Trim
© Copyright 2019 NC Builders by NowCrowd